LIVE: Scene after columns in NYC high-rise buckle

| News | July 07, 2026 | 10.8 Thousand views

TL;DR

A 37-story Manhattan high-rise undergoing office-to-residential conversion experienced severe structural failure when two columns buckled on the 21st floor, prompting emergency evacuations of thousands and establishment of a frozen zone as engineers race to prevent collapse.

🏗️ Structural Failure & Immediate Impact 3 insights

Two Columns Buckled on 21st Floor

Two structural load-bearing columns buckled on the 21st floor of the building at 235 East 42nd Street, causing multiple cracks and sagging floors.

Mass Evacuations Ordered

Thousands of people were evacuated from the building and seven surrounding structures within a frozen zone spanning 40th to 45th Streets between 1st and 3rd Avenues.

Continued Movement Detected

Specialized monitoring tools detected ongoing movement in the compromised columns measured in centimeters, confirming the building remains actively unstable.

🚨 Emergency Response & Risks 3 insights

Localized Collapse Risk

FDNY officials stated the steel-frame construction reduces the risk of total collapse, but warned of potential localized collapse as the structure continues to shift.

Drone and Sensor Monitoring

Engineers and FDNY teams are utilizing drones and vantage points across the street to continuously monitor the building's movement and assess stability.

Shoring Equipment Staged

Emergency struts and trusses are on site ready to be deployed immediately once engineers confirm the 21st floor is safe enough for entry teams to begin shoring operations.

🔍 Investigation Context 3 insights

Office-to-Residential Conversion

The 37-story building was actively being converted from commercial office to residential use with an 11-floor addition being constructed above an existing 22-floor section.

Union Allegations of Corner-Cutting

A union representative alleged that non-union contractors cut corners on the project, though city officials emphasized the cause remains under active investigation.

All Workers Accounted For

Officials confirmed there were no injuries and every construction worker was accounted for following the emergency evacuation.

Bottom Line

Avoid the frozen zone between 40th-45th Streets and 1st-3rd Avenues until officials confirm the building is structurally stabilized and shored, as the compromised columns remain in active motion.

More from Reuters

View all
LIVE: Trump meets Zelenskiy on sidelines of NATO summit
35:51
Reuters Reuters

LIVE: Trump meets Zelenskiy on sidelines of NATO summit

During a NATO summit meeting with President Zelenskiy, Donald Trump emphasized preventing Iranian nuclear weapons through maximum pressure, claimed both Putin and Zelenskiy desire to end the Ukraine war immediately, and proposed licensing Patriot missile production to European allies to accelerate defense capabilities.

1 day ago · 9 points
LIVE: Body of Iran's late Supreme Leader Khamenei arrives in Iraq
1:41:25
Reuters Reuters

LIVE: Body of Iran's late Supreme Leader Khamenei arrives in Iraq

The video depicts funeral proceedings for Iran's Supreme Leader Ali Khamenei in Iraq, featuring Shiite religious rituals, Quran recitations, and poetic eulogies framing his death as martyrdom while emphasizing cross-border religious solidarity between Iranian and Iraqi mourners.

2 days ago · 8 points
LIVE: French President Emmanuel Macron visits Syria
54:07
Reuters Reuters

LIVE: French President Emmanuel Macron visits Syria

French President Emmanuel Macron visits Damascus to meet with Syrian President Ahmed al-Sharaa and announce French economic engagement, including €230 million in investments targeting infrastructure, energy, and water sectors as Syria emerges from isolation.

2 days ago · 7 points
How a French building giant tackled fragmentation
34:17
Reuters Reuters

How a French building giant tackled fragmentation

Saint-Gobain CEO Benoit Bazin explains how the 360-year-old French building materials giant transformed from a centralized European-centric organization into a decentralized 'multilocal' company, diversifying into North America and emerging markets while adapting to geopolitical fragmentation and climate-driven demand for resilient infrastructure.

2 days ago · 9 points